Sign In | Join Free | My bushorchimp.com |
|
Brand Name : FYTLED
Model Number : T60D-100W,150W,300W
Certification : CE, RoHs, UL, DLC
Place of Origin : China
MOQ : 30
Payment Terms : L/C, T/T
Delivery Time : 5-8 working days
Packaging Details : 1pcs/CTN
Price : US40-102/pcs
Material : Massive aluminum
Color : Brown
Application : Parking lots & Area Lighting
Size : 530.5*260*66mm, 580*310*66mm, 766.5*330*76mm
Power : 60W,100W, 150W,200W,300W
Accessories : Slip fitter,Square pole mount,Round pole mount, Yoke mount
IP Rating : IP66
Color temperature : 3000K, 4000K, 5000K,6000K
Light Source : EMC3030 LEDs
Beam angle : Type 3, Type 4, Type 5
Warranty : 5 years warranty
General Information | Product Type | LED Shoebox Light 60W-300W |
Product Size | 530.5*260*66mm,580*310*66mm,766.5*330*76mm | |
Product Color | Bronze, or custom | |
Electric parameter | Input Voltage | AC100-277V & AC277-480V /50-60Hz |
Power | 60W,100W,150W, 200W,300W | |
PF | >0.95 | |
Driver Brand | Tomcarline/Meanwell or other famious brand | |
Optical Parameter | LED | EMC3030 |
CRI | >70,or 80 options | |
Color Tempearture (CCT) | 3000-6000K | |
Luminous Efficiency | 140lm/w | |
Beam angle | TYPE3 / TYPE4 / TYPE5 | |
Standards & Certification | Type of protection | IP66 |
Tested dielectric strength | 3.75KVac | |
Safety features | Open circuit protection; short circuit protection ; overvoltage protection | |
Certificates | CE, RoHS, UL, DLC | |
Energy efficiency class | A+ & A++ | |
Temperatures & operating conditions | Heatsink temperature | 5~+70℃ |
Ambient temperature | -30~+55℃ | |
Storage temperature | -40~+80℃ | |
Others | Lifetime | 50,000Hr |
Operating temperature | -40℃~50℃ | |
Warranty | 5 years | |
Materials | AL housing+PC lens +AL board | |
Application | Parking lots & Streets,Outdoor basketball court, tennis court,Badminton court, football field,The school playground, stadium.,Walkways and building grounds |
FAQ
1. Q: Where is your target market?
A: Our products have been exported to Middle East, Southeast Asia, South America and Europe and so on, we are sure we can meet your market demands.
2.Q: What is your MOQ?
A: Depends on the product .Usually the MOQ is 1pcs.
3.Q: How long is the sample production time?
A: About 4-7days. Butif you want a specialsample, it will need some times to make the mold.
4.Q: What is the Payment?
A: Usually we adopt the T/T, and we have 3 ways:
1)30% advance deposit, the Balance should be paid off before shipment.
2)30% advance deposit, 30% payment before shipment, 40% payment again the B/L copy.
3)50% advance deposit, the Balance should be paid off after received B/L copy in 3 days.
But if you want to adopt other payments, it will depend on your order quantity.
5.Q:How long is the delivery time?
A:About 7 days
![]() |
UL Listed Shoebox Parking Lot Lights Images |